2020-2021 Fees and Charges

Home          Search A-Z        

 
Albury Waste Management Centre - Disposal Fees – Special Items
ProductEnabling Auth.Unit Of MeasurePrice CategoryGST InclusiveCharge/Fee Comments
Green Waste, Concrete, Bricks, Plasterboard, Soft furnishings A per tonne E Yes$57.00  **

Engineering Contract and Development Fees - Subdivisional Works - Landscaping Bond
ProductEnabling Auth.Unit Of MeasurePrice CategoryGST InclusiveCharge/Fee Comments
Concrete Pathway - Bond A Square metre E No$145.00 

Water Charges - Water Meter Connection – Standard(Land Parcel > 2 ha)
ProductEnabling Auth.Unit Of MeasurePrice CategoryGST InclusiveCharge/Fee Comments
20mm meter connection where the service already exists into the property and where the Land Parcel is > 2 ha (Includes meter assembly and concrete ring).
Note: This work is carried out by Albury City Only.
A each B No$1,484.75 
25mm meter connection where the service already exists into the property and where the Land Parcel is > 2 ha (Includes meter assembly and concrete ring)
Note: This work is carried out by Albury City Only.
A each B No$1,615.80 

Cemeteries and Crematoria - Interment Right, 1st Interment, Marker - Packages
ProductEnabling Auth.Unit Of MeasurePrice CategoryGST InclusiveCharge/Fee Comments
Perpetual Interment Right - 13yrs - 100+ yrs Multiple coffin interment allotment within lawn adult section including one standard burial plaque with 8 lines (381mm x 279mm) and one single concrete marker stone A each E Yes$4,590.00Interment Right - 13yrs - 100+yrs double depth within lawn graves adult section including one standard burial plaque with 8 lines (381mm x 279mm) and one single concrete base from: